Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Let us cram metal sheets, glass, and wires into manufacturers again
#17
To actually properly ratio it out, all things need to be increased by multiple of 4, if we actually work backwards logically.

Why? The smallest unit that one processor could possibly take is 1 floor tile. One sheet = 4 floor tiles.
By changing it so that 1 floor tile = 1 metal bar, therefore it would take 4 metal bars to make 1 sheet.
Similarly 1 rod = 2 metal bars, and scrap/misc items can be worth whatever amount. This makes should make everything run smoothly with no confusion.

Almost. This now would mean to produce an item in the manufacturer, what would normally cost 1 bar now costs 4. To combat this, as previously stated, quantities within stuff like manufacturers would need to be increased by 4.

Also what frank touched regarding quality could factor in what amount ore would produce.
Reply


Messages In This Thread
RE: Let us cram metal sheets, glass, and wires into manufacturers again - by Sundance - 08-10-2017, 01:36 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)