Thread Rating:
  • 2 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Manta FixThisShit aka how I learned to love torpedoes
#39
(09-18-2019, 05:47 AM)aft2001 Wrote: The courtroom APC is not properly hooked up to the power grid. 1 or 2 tile lengths of wire to the North of the APC's terminal should re-connect it.

Could there be a special SMES in the Engine Room that is SPECIFICALLY for taking grid power and putting it into the emitters, ALONGSIDE a direct connection from the radiation collectors to the emitters? Essentially this would ensure that, as long as there is either residual power in the power grid OR the radiation collectors are connected and active, the emitters will stay online. Essentially a failsafe to ensure that the containment field doesn't fail if the main engine SMES units are disabled.
Not quite a bug but would be nice to have.



Good suggestions and good bug finding, I'll start cracking on this stuff on the weekend.


Messages In This Thread
RE: Manta FixThisShit aka how I learned to love torpedoes - by Azungar - 09-19-2019, 07:56 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)