03-20-2013, 07:47 AM
Update: interior about 80% done.
Here's the new biomass
+ Adjacent wires
Main computer (the pod control, pilot control, w/e you want to call it)
Here's the interior concept, about 80% complete as I said, it's missing one or two things but otherwise this is the general feel of the interior base the martians occupy.
Here's the new biomass
+ Adjacent wires
Main computer (the pod control, pilot control, w/e you want to call it)
Here's the interior concept, about 80% complete as I said, it's missing one or two things but otherwise this is the general feel of the interior base the martians occupy.