10-19-2016, 10:20 PM
(10-19-2016, 07:49 PM)Boa Jacque Wrote:(10-19-2016, 07:18 PM)Grek Wrote: TBH I'd be happy if QM just got the option to have a conveyor that went straight from the receiving bay to the hallway outside QM
Yes, good idea. Perhaps tie it in to the existing conveyor that leads into the hall. A segment stretched between the existing conveyors would be rad -- but it should probably be controlled by a switch to avoid it becoming a nuisance to the QM as he walks his department.