Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Destiny & RP on Goonstation
#59
DocSalient Wrote:So, if someone could put together a quick-and-dirty guide to the NEW engine, that'd be much appreciated. It's just similar enough to the Cogmap TEG to screw you over if you think like the old one.

Furnace setup:
1) load furnaces with char
2) open up all the valves
3) load plasma canisters onto auxiliary ports for both hot and cold loops
4) turn on furnaces
5) set both southeast and southwest SMES to draw 200000W, out put 60000W
6) every 10-15 minutes, take the canister from the hot auxiliary loop and attach it to the cold loop gas unit at pump level 5 until empty, then replace.
7) Every 20-30 minutes refill the furnaces

Combustion setup:
1) acquire a 66%/33% oxygen/plasma mix
->1a) hook up a plasma tank and an empty tank to the mixing valve in the northeast of the room
->1b) unhook the plasma canister, attach it to the hot loop input at pump level 1
->1c) hook up an oxygen canister to the mixing valve, you now have the mix
2) hook up a single can of mix to the combustion chamber feed, input level 1 and open the valve
3) ignite the mix, open the vent
4) hook up a nitrogen canister to the other combustion feed at pump level 2, do not open the valve
5) hook up a plasma canister to the cold loop auxiliary and the cold loop input at pump level 5, open the valves
6) hook up a plasma canister to the hot loop input at pump level 1 (skip if you performed step 1b) and open the hot loop valves
7) Set the SMES as in the furnace setup
8) keep an eye on the loops. when the hot loop starts hissing and showing warnings, close the combustion vent and introduce nitrogen. this will cool it down without stifling the fire. open up the vent and stop introducing nitrogen when warnings cease.

Hellburn Setup:
1) exactly the same as the combustion setup, but with some minor tweaks I'll let you figure out on your own!
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 6 Guest(s)