Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
New Engineering computer, or APC change
#6
Cogwerks Wrote:no

Most of the APCs will actually be in maintenance behind the associated office, with a few exceptions. Same cardlock as before.

Goddamn dudes, if you want the lights to stop wasting power, USE THE LIGHT SWITCH ON THE WALL

keep forgetting it exists because i'm just not used to robotics having it :oops:


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)