Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Engineering Department Improvements
#5
I think the problem with just upping the drain on machines like the artlab ones is you'd run into the same problem as telesci where you'd just drain the APC while having full SMES units because the wires weren't meant to cope with that much load.
Reply


Messages In This Thread
RE: Engineering Department Improvements - by LeahTheTech - 02-19-2022, 10:40 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)