03-07-2021, 10:16 PM
Quote:note: every x unit = 1MW/tick, every y unit = 1 credit/tick
Tick is 4.8 seconds in this context
Big change is essentially between 1-20 is with a meaningful tangent at around 7MW.
Proposal (Purple Graph):
4MW = 9 Credits
1 minutes at 4MW = 112.5 Credits
Credits are the split between Station Payroll (Credits/2) and Engineering Staff (Credits/(2*StaffCnt)
Current Behavior (Green Graph):
4MW = 0.119 Credits
1 minutes at 4 MW = 1.4875 Credits
Made a new Desmos graph: https://www.desmos.com/calculator/mizlblv3wr
Labeled axis, made "demo" solution where you can put in minutes of the round and MW and it'll show you the output with proposed calculation.