Thread Rating:
  • 3 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
[MERGED PR] ATMOS Pipe Repair and Replacement
#1
Thumbs Up 
PULL REQUEST DETAILS

[feature][input wanted][balance]




About the PR

1. Adding new state for simple atmos pipes. "Destroyed"
* All contents of the pipe segment (gas) will be passed to the turf/tile.
* "Destroyed" state becomes the more likely state when **exploded** instead of pipe removal.
* Destroyed state becomes a possible state when pipe pressure exceeds **10 times** the fatigue pressure.
[Image: 107140995-d0318e80-68da-11eb-8136-69f6b1b4562c.png]

2. Destroyed state requires the piping segment be replaced by rods.
* 15 second duration (~7 seconds with carpenter or engineering training)
[Image: 107140857-fd317180-68d9-11eb-874f-fbdf6e5e9546.png][Image: 107140867-028ebc00-68da-11eb-83f0-9a84fdbf8553.png]
* 4 welds to fully repair
[Image: 107140870-0589ac80-68da-11eb-95f5-d31518bbe796.png]

3. Ruptured pipe **can** continue to rupture to a higher state.

Why's this needed?
Addresses issues and complaints about engineering getting bombed by providing engineering the capability of replacing severely damaged sections of pipe.

Changelog


Code:
changelog
(u)Azrun
(*)Atmospheric pipes have a new severely damaged state that requires replacement by rods (and then welding).  Reduced chance of removing pipes from explosions in favor of new state.  Can also achieve new state through extreme pressure...


PULL REQUEST DETAILS


Messages In This Thread
[MERGED PR] ATMOS Pipe Repair and Replacement - by github_bot - 02-07-2021, 12:48 AM

Forum Jump:


Users browsing this thread: 2 Guest(s)