05-20-2013, 03:23 PM
At the very least, can we make the rollers and mass drivers link into the power network? It always bugs me when the station is blacked-out, nothing works, except the conveyor belts are chugging along no problem.
Just a small QM thing.
|
« Next Oldest | Next Newest »
|
Messages In This Thread |